
Institutional owner, Downtown Detroit
38-story riverfront office tower
Challenge
Previous vendor needed full sidewalk closures and took 19 working days per cycle.
Solution
Switched three elevations to rope access with rolling exclusion zones and a two-crew schedule.
- working days per cycle
- 11
- sidewalk closures
- 0
- lower annual cost
- 22%











